CD Energy Consultants
A final BER for a finished new build
When the house is built and ready to occupy, it needs a final BER based on a site visit.
A newly built dwelling needs a BER before it is occupied or sold. There are two different certificates people mix up. A provisional BER is prepared from drawings, off the plans. A final BER is based on the finished building and a site survey, together with the specifications.
Cian carries out final BER assessments on completed homes. Placeholder: provisional, off-plan BERs are not confirmed. Ask before you assume he can issue one.
For a final assessment he will need the house to be ready to inspect, plus the paperwork that shows what was built: insulation type and thickness, window and door specifications, heating and ventilation details, and airtightness results if a test was done. Missing specifications are the usual reason a new-build BER stalls.
If you are selling off the plans, talk to him before you promise a date to a purchaser. Placeholder: turnaround depends on the paperwork being complete.
Tell him where the site is. Coverage is based in Donabate. Placeholder: counties outside Dublin are still being confirmed.